Australian data-centre field map
Where are Australia's data centres?
Explore the physical infrastructure behind cloud services and AI, and investigate why facilities are built where they are.
Last updated 8 August 2026
How to explore
- 1Filter
By location or project stage.
- 2Choose a marker
Inspect the place and status.
- 3Open the record
Check its evidence, unknowns and Rosie's question.
Explore Australian data-centre records
Operational
Public evidence indicates that the facility is currently running.
Operational, campus expanding
At least one facility is running while additional campus construction or expansion is documented. This does not mean the entire campus is complete.
In assessment
A relevant authority is considering the proposal. This is not an approval and does not prove construction has begun.
Announced, early stage
The project has been publicly announced or described at an early stage. It may change or never proceed.
Data centre records
NEXTDC S1Macquarie Park, SydneyOperational
Evidence checked 8 August 2026
- Operator or applicant
- NEXTDC
- Record type
Colocation facility
A data centre where several organisations rent space, power and network connections from the operator.
- Status note
- NEXTDC currently lists S1 as part of its operating Sydney network.
- Why this place?
- Macquarie Park places the facility in an established Sydney business and technology precinct with extensive network connections.
Important unknowns
- Current site-wide electricity demand is not published on the reviewed facility listing.
- Comparable current water-consumption data was not found in the reviewed source.
Project AtlasEastern Creek, Western SydneyIn assessment
Evidence checked 8 August 2026
- Operator or applicant
- Goodman Property Services (applicant)
- Record type
Proposed campus
A planned group of data-centre buildings. A proposal does not prove that approval, construction or operation will follow.
- Status note
- The NSW Planning Portal lists the proposal at the Response to Submissions stage. It has not been determined or built.
- Why this place?
- The proposal is in Western Sydney, where several large data-centre projects and major electricity connections are already concentrated.
Important unknowns
- The planning process has not reached a determination.
- The application describes total power consumption, not current operating demand.
- Final construction staging and operating configuration may change.
CDC Brooklyn CampusBrooklyn, MelbourneOperational, campus expanding
Evidence checked 8 August 2026
- Operator or applicant
- CDC Data Centres
- Record type
Multi-building campus
A group of data-centre buildings managed as one larger site. Individual buildings may be at different stages.
- Status note
- CDC says BK1 is operational and other Brooklyn campus facilities are under construction.
- Why this place?
- Brooklyn is in Melbourne's west, an area with industrial land and access to metropolitan power and network infrastructure.
Important unknowns
- The completion timing of the remaining campus facilities may change.
- Current measured water and electricity use was not published on the reviewed location page.
NEXTDC B2Fortitude Valley, BrisbaneOperational
Evidence checked 8 August 2026
- Operator or applicant
- NEXTDC
- Record type
Colocation facility
A data centre where several organisations rent space, power and network connections from the operator.
- Status note
- NEXTDC describes B2 as an operating Brisbane facility.
- Why this place?
- The operator highlights proximity to Brisbane CBD and connections to major cloud and carrier networks.
Important unknowns
- The operator publishes design and target metrics, which are not the same as current total resource use.
- Comparable current water-consumption data was not found on the reviewed page.
NEXTDC P2Perth CBDOperational
Evidence checked 8 August 2026
- Operator or applicant
- NEXTDC
- Record type
Colocation facility
A data centre where several organisations rent space, power and network connections from the operator.
- Status note
- NEXTDC describes P2 as an operating Perth facility.
- Why this place?
- NEXTDC describes the Perth location as providing access to submarine cable systems. This operator claim has not yet been independently corroborated with a telecommunications or network source.
Important unknowns
- Published IT capacity is not a statement of current electricity consumption.
- Comparable current water-consumption data was not found on the reviewed page.
NEXTDC A1Adelaide CBDOperational
Evidence checked 8 August 2026
- Operator or applicant
- NEXTDC
- Record type
Colocation facility
A data centre where several organisations rent space, power and network connections from the operator.
- Status note
- NEXTDC officially opened A1 on 4 September 2024 and currently lists it as its Adelaide facility.
- Why this place?
- Its central Adelaide location is positioned to serve enterprise, government and research customers across South Australia.
Important unknowns
- Target efficiency figures are not current measured site-wide consumption.
- Comparable current water-consumption data was not found on the reviewed page.
NEXTDC C1Bruce, CanberraOperational
Evidence checked 8 August 2026
- Operator or applicant
- NEXTDC
- Record type
Colocation facility
A data centre where several organisations rent space, power and network connections from the operator.
- Status note
- NEXTDC describes C1 as an operating Canberra facility.
- Why this place?
- The operator emphasises proximity to government customers and national digital infrastructure.
Important unknowns
- Security descriptions do not reveal which customers or workloads use the site.
- Comparable current water and electricity consumption was not found on the reviewed page.
Project SouthgateWesley Vale, northern TasmaniaAnnounced, early stage
Evidence checked 8 August 2026
- Operator or applicant
- Firmus
- Record type
Proposed campus
A planned group of data-centre buildings. A proposal does not prove that approval, construction or operation will follow.
- Status note
- Firmus describes Southgate as a long-term initiative. ABC News reported on 22 July 2026 that a development application had been submitted, but Latrobe Council was waiting for more information before releasing it publicly. This record does not treat either statement as approval or construction.
- Why this place?
- Firmus points to existing industrial electricity infrastructure as one reason for considering Wesley Vale.
Important unknowns
- The development application was not publicly available in the reviewed sources, so its current formal status and contents could not be checked directly.
- The cooling-water source remains unsettled. Firmus says rainwater is its primary plan, while ABC News reported that an internal FAQ note referred to possible Tasmanian Irrigation water and was removed after questions. Tasmanian Irrigation said it had made no undertaking to supply Firmus.
- Final scale, staging and operating resource use remain uncertain.
NEXTDC D1DarwinOperational
Evidence checked 8 August 2026
- Operator or applicant
- NEXTDC
- Record type
Colocation facility
A data centre where several organisations rent space, power and network connections from the operator.
- Status note
- NEXTDC officially opened D1 on 14 August 2024 and currently presents it as its operating Darwin facility. Its opening announcement described partnerships with the Northern Territory Government and Vocus; that partnership wording remains an operator claim.
- Why this place?
- The operator highlights Darwin as a northern gateway near domestic fibre and routes connecting Australia with Asia.
Important unknowns
- Target metrics do not show current total electricity or water use.
- The mix of workloads using the facility is not publicly identified.
Project AresBarkly region, near ElliottIn assessment
Evidence checked 8 August 2026
- Operator or applicant
- Energy North (Singapore-headquartered proponent)
- Record type
Proposed campus
A planned group of data-centre buildings. A proposal does not prove that approval, construction or operation will follow.
- Status note
- Project Ares is in two distinct environmental processes. The Commonwealth EPBC portal lists referral 2026/10560 as awaiting additional information. Separately, the NT EPA accepted the proposal for standard assessment at Stage 1 on 6 July 2026. Neither status is an approval or evidence of construction.
- Why this place?
- The proposal combines remote digital infrastructure with large new energy, storage and water systems.
Important unknowns
- The Commonwealth EPBC process has not reached a final determination or approval.
- The NT environmental assessment is still at Stage 1: Referral.
- The proposal identifies groundwater from the Montejinni Limestone Aquifer in the Wiso Basin and an upper estimate of 4 GL a year. Sustainable yield, environmental effects and any extraction licence remain matters for assessment and approval.
- The proposal may change substantially through assessment.
- Proposed maximum capacities are not actual operating demand or use.
No records match these filters. Reset the filters to see every record.
Approximate locality map
Where do these records sit?
Markers show approximate localities, not precise facility entrances. The map is schematic and not for navigation.
Selected marker
NEXTDC S1
Evidence trail
How we know what we know.
This register explains which sources support each marker, what those sources cannot establish and where information remains uncertain.
Open the provenance and source register17 linked sources · dataset checked 8 August 2026
Evidence labels
Three different kinds of statement
- Directly sourced
- A fact stated in a linked planning record, regulator page, dated report or clearly attributed operator page.
- PvA interpretation
- A cautious explanation that connects sourced facts, such as why access to fibre, customers or power may make a location useful.
- Important unknown
- A gap that cannot be answered reliably from the reviewed evidence. Unknowns are kept visible rather than filled with assumptions.
Method
How records were selected and checked
This is not a complete Australian directory. The current dataset contains 10 campus-level records chosen for geographic variety, different project stages and enough public evidence for record-by-record checking. It is not a statistical sample and cannot be used to estimate national totals. Map markers show approximate public localities rather than facility entrances or property boundaries.
- Prefer statutory planning and environmental records.
- Use government and regulator publications next.
- Use current operator pages for what an operator publicly states.
- Treat developer material cautiously, especially when a proposal is contested or early stage.
- Use industry datasets for national context, not as automatic proof for individual records.
National context and map
Shared sources
Industry and commercial dataset
Australian Data Centre Forecast Report, Issue 1
Published or current: April 2026; data current at 31 March 2026
Used for: National context, including the concentration of operational activity in New South Wales and Victoria.
Limitation: Its facility and pipeline definitions may not match other directories, and pipeline projects may not proceed.
Public-domain cartographic data
Natural Earth: Admin 0 Countries, 1:110m
Used for: The simplified outline of Australia.
Limitation: Small-scale geometry for orientation only. It is not suitable for navigation, property identification or precise locality mapping.
Record-by-record evidence
Facility and proposal sources
NEXTDC S1
Last checked 8 August 2026
operator
NEXTDC Australian data-centre locations
Used for: S1 identification and its current inclusion in NEXTDC's operating Sydney network.
Limitation: Operator source. It does not independently establish current electricity or water use.
Project Atlas
Last checked 8 August 2026
planning authority
NSW Planning Portal: Project Atlas Data Centre Eastern Creek
Used for: Applicant, public locality and current planning stage.
Limitation: Planning records describe a proposal that can change. They do not establish construction or operation.
CDC Brooklyn Campus
Last checked 8 August 2026
operator
CDC Data Centres: Melbourne locations
Used for: Brooklyn campus identity and the distinction between an operational building and facilities under construction.
Limitation: Operator source. Construction timing and performance claims require continuing review.
NEXTDC B2
Last checked 8 August 2026
operator
NEXTDC B2 Brisbane
Used for: B2 identity, public locality and operational description.
Limitation: Operator source. Design and target figures are not current measured total use.
NEXTDC P2
Last checked 8 August 2026
operator
NEXTDC P2 Perth
Used for: P2 identity, public locality, operational description and NEXTDC's submarine-cable-access claim.
Limitation: Operator source. The connectivity claim has not been independently verified with a regulator or network source.
NEXTDC A1
Last checked 8 August 2026
operator
NEXTDC A1 Adelaide
Used for: Current A1 facility description and public locality.
Limitation: Operator source. It does not independently establish current resource use or customer mix.
operator
NEXTDC A1 opening announcement
Published or current: 4 September 2024
Used for: The dated opening of A1.
Limitation: Company announcement. Certification and technical claims need separate verification if used.
NEXTDC C1
Last checked 8 August 2026
operator
NEXTDC C1 Canberra
Used for: C1 identity, public locality and operational description.
Limitation: Operator source. It does not establish customer or workload details.
Project Southgate
Last checked 8 August 2026
Source-history note: Source history matters here. ABC News reported that Firmus removed an internal note about possible Tasmanian Irrigation water from this FAQ after questions. The current developer page is therefore read alongside the dated ABC report, not as a complete record of what was previously published.
independent reporting
ABC News: Firmus plan to use state-owned agricultural irrigation water
Published or current: 22 July 2026
Used for: The submitted development application, Latrobe Council's request for more information, the deleted FAQ note and statements from Firmus and Tasmanian Irrigation about possible water sources.
Limitation: News reporting, not the planning application itself. The application was not public in the reviewed material.
developer
Firmus: Project Southgate Wesley Vale FAQs
Used for: Firmus's current description of the proposal, locality, industrial context and stated rainwater-first cooling plan.
Limitation: Mutable developer page with no visible revision history. ABC News reported that an internal note about possible Tasmanian Irrigation water was removed after questions.
NEXTDC D1
Last checked 8 August 2026
operator
NEXTDC D1 Darwin
Used for: D1 identity, public locality and current operational description.
Limitation: Operator source. Gateway and connectivity claims are not independent telecommunications evidence.
operator
NEXTDC D1 opening announcement
Published or current: 14 August 2024
Used for: The dated opening and NEXTDC's description of partnerships with the Northern Territory Government and Vocus.
Limitation: Company announcement. Partnership and gateway claims should be attributed to NEXTDC.
Project Ares
Last checked 8 August 2026
government regulator
EPBC Act Public Portal: Project Ares referral summary
Used for: EPBC number 2026/10560, current Commonwealth project status, proponent description, proposed scale and groundwater source.
Limitation: A referral describes a proposal and can change. The portal notes that project-status fields are being updated.
government regulator
NT EPA assessment register: Project Ares
Published or current: Last updated 8 July 2026
Used for: The separate NT process, Stage 1 referral status and the 6 July 2026 decision to accept the referral for standard assessment.
Limitation: This register covers the NT process only. It does not replace the separate Commonwealth EPBC process.
developer
Energy North: About
Used for: Energy North's statement that it is headquartered in Singapore with delivery and operational teams in Australia.
Limitation: Developer source. Corporate and project claims should be attributed to Energy North unless independently verified.
Production provenance
Human judgement remains responsible.
The dataset, wording and interface were prepared with Codex AI assistance under human editorial direction. AI helped organise sources, draft cautious summaries and implement the prototype. It was not used as an evidence source.
Every public factual claim must remain traceable to the linked material. The first review pack was checked externally on 8 August 2026 and corrected against current official sources before this prototype review.