Interactive lab · Nothing is saved

Plan a fictional data centre.

Help Rosie work through the design options for an AI data centre near a fictional Australian town, and the implications each option has for energy, water and the community. Then, have a go at building your own data centre.

Rosie investigates a felt data centre with visible server racks, cooling pipes and ventilation equipment.
AI-assisted illustration

This is a guided investigation, not an engineering calculator or an assessment of a real development. You are not deciding whether AI is good or bad. You are learning what to look at.

Data centre decision lab

What would you need to know?

Step 1 of 7
First step

The job is already chosen.

Use the Back and Continue buttons to first navigate the example. You do not need to choose a proposal for the first activity.

Your data centre build
Assembly · build in progress
Meet our guides
RosieAsks what we know, what we do not, and what to check next.
NeighbourNotices noise, construction and day-to-day local impacts.
Local politicianAsks about water, grid pressure and public responsibilities.
Independent community plannerChecks who benefits, who pays and what evidence is shared.

AI-assisted illustrations.

Signals update as you build.
Open day · Data centre decision lab

The centre is assembled. What is known?

A cooling label alone cannot establish PUE, WUE or annual resource use.